How do I know if my roof will outlast the panels?
Compare the roof's age to its expected life. InterNACHI estimates about 20 years for 3-tab shingles, 30 for architectural shingles and 40 to 80 for metal (InterNACHI). If the roof will need replacing while the panels are still working, replace first.
What does removing panels later involve?
A solar-licensed contractor removes and reinstalls the panels, with electrical work and sometimes a separate permit; see solar panel removal for a reroof.
How do I coordinate the two contractors?
Get the roofer and installer to agree on attachment flashing, who warrants roof penetrations and the order of work. CSLB has separate classifications for roofing (C-39) and solar (CSLB C-39).
What roof is best under solar?
Long-life roofs reduce the chance of removing panels again: architectural shingles, metal or tile with new underlayment. See metal vs. shingles.
For your actual price, request a free written estimate: a licensed roofer measures the roof and prices your exact scope.
Every roofer we work with is licensed, insured and highly reviewed by Bay Area homeowners.
Get a free replacement quoteFrequently asked questions
Should I replace my roof before solar?
If the roof has less life left than the panels, usually yes.
Who warrants the roof around solar mounts?
Agree in writing whether the roofer or solar installer warrants the penetrations.
Can I do roof and solar at the same time?
Yes; coordinate the schedule so the roof is finished before mounts are flashed.
Sources
Sources reviewed November 12, 2026. Figures are published estimates and official fees, not quotes. Confirm prices, permits and requirements with your contractor and building department. This page is general information, not legal or insurance advice.